Electricians Projects

Project image 1
Project image 2
Project image 3
Project image 4
Project image 5

Electrical Installation Works at the Tank Farm

Installation of cable routes, laying and connection of power and control cables, connection of sensors, connection of electric actuators and electrical heating systems, installation of junction boxes and grounding of system components.

Project image 1
Project image 2
Project image 3
Project image 4
Project image 5
Project image 6
Project image 7

Ventilation Systems – Electrical Installation & Automation

Electrical installation and automation works for ventilation systems were carried out at the site. Installation and connection of damper actuators, routing of power and control cables, and installation of junction boxes and control elements were completed. Installed and fully wired MSR / BMS control cabinets include circuit breakers, relays, and terminal connections. Cable routes are neatly organized and labeled. The works were executed with a focus on reliable operation, easy maintenance, and future system expansion.

Project image 1
Project image 2
Project image 3
Project image 4
Project image 5
Project image 6
Project image 7

Installation of Server Cabinets and Structured Cabling System

Server and distribution cabinets were installed, including cable routes and cable fixings. CAT7 internet cables were routed and neatly organized inside the cabinets and along the cable pathways. Patch panels, servers, and network equipment were connected with structured cable management. The works ensure reliability, easy maintenance, and proper operation of the IT infrastructure.

Project image 1
Project image 2
Project image 3
Project image 4
Project image 5

Installation of Lighting and Emergency Systems

General and emergency lighting systems were installed at the facility. Luminaires were mounted in technical rooms and connected to existing electrical circuits. Illuminated Exit signs were installed to ensure safe orientation and evacuation. The emergency lighting system was tested for proper operation in case of a main power failure. All works were carried out in compliance with applicable standards and safety requirements.